The assembly of the pelletizing line with a capacity of 2.5t/h in Poland has begun. The delivered equipment is currently assembled and connected within the complete production line. Works include installation of equipment, connection of systems, adjustments and preparation for commissioning.
Assembly of the pelletizing line 2.5t/h - Poland
Start of assembly of delivered equipment in Poland